For professionals

Property condition report before and after your works

Digging, building or demolishing next to existing homes? Record first how everything looks. Boengi makes the report (plaatsbeschrijving) independent, with photo and video, and legally watertight, from a single home to an entire street.

Last updated: · by the Boengi team

Team in discussion on the building site
What is it?

What is a property condition report?

A property condition report is a detailed record of the state of buildings and surroundings, facade by facade and room by room. Cracks, stains, subsidence and wear are described and photographed or filmed.

Is it drawn up by an independent expert, before the works start and after they end? Then everyone can see at once whether damage already existed. Such a report holds up in a dispute or an insurance file.

No discussion afterwards

A crack or subsidence after the works? With a report made beforehand it is immediately clear whether you are responsible. That saves time, money and unpleasant files.

Liability for construction works: rules from civil law and your insurance policy. (to be confirmed)

When?

When is a property condition report useful?

The most common situations:

  • Before digging, building or demolition works next to existing homes or on public ground.
  • After the works, with a comparative report of the situation beforehand.
  • Landlords and property managers with several properties: move-in and move-out in one series.
  • Utilities and network operators for pipe works and fibre roll-out, street by street.
What you get

A report that holds up.

  • Neighbouring homes and buildings
  • Pavements, roads and public ground
  • Dated photos and video, per facade and room
  • Comparative report after the works
  • Digital file, sent quickly
For whom

Who requests this?

  • Contractors and demolition companies
  • Utilities and network operators
  • Developers and clients
  • Property managers and landlords
  • Governments and public bodies
How it works

From request to report.

  1. Proposal

    You tell us about your site or portfolio. We send a tailored proposal, usually within one working day.

  2. Site visit

    The expert describes and photographs or films every facade and room. For a long site we plan it per phase.

  3. Report

    You get a clear digital report, ready for your file. After the works we make the comparative report.

Frequently asked questions

Questions about property condition reports for works.

Not always, but strongly advised for digging, building and demolition next to existing buildings. Many insurers and clients also require it. (to be confirmed)

For works, usually the client or the contractor. For rentals the cost is usually shared between tenant and landlord.

That depends on the number of buildings, the length of the route and the level of detail. You get a tailored proposal, usually within one working day.

Yes. Boengi has been doing this for years on utility and infrastructure works, from one home to an entire street.

Starting works soon?

Record first how everything looks. Tell us about your project, we respond within one working day.

Request a proposal

or email info@boengi.be